2012/09/03

SURVEY Boats Fish in Indonesian Waters

SURVEY Boats Fish in Indonesian Waters 1. Measurements, sketches and technical data inventory. Before making measurements, sketches and technical data inventory of traditional fishing vessels first determine how the ship will be the object of a targeted measure the amount of Gross tonnage is expected. Vessels to be measured is the traditional Fishing Vessels size limit ± 30 GT. Difficulties encountered from some field observations is that the size of GT on ships of comparable size have different main GT sufficient to raise doubts. Hence teams tend to agree as the primary measure for determining the basic guidelines in choosing objects survey ship. In the implementation of the survey measurements, sketches and technical data inventory of traditional fishing vessels were divided in several parts of the ship such as: 1. Measurement of the body below the main deck. 2. Measurement to the top of the building. 3. Sketching layout below the main deck, 4. Measurement of main engine parts konstruksi.dan collection. 5. Inventory deck gear. 1.1. Measurement of the body below the main deck. a. For the measurement part of the hull below deck requires some measurement tools include: rollmeter that measures 50 and 5 meter, measuring instruments basanometer ship, waterpass, Lasser distance meter range of other support equipment such as markers marker, wooden pencil, pen, flashlight, and a blank field survey base. b. Measurements in this section requires a power of 3 (three) persons who consists of 2 (two) experts and 1 (one) supervision. c. As a first step is to conduct measurements of the overall length of the vessel (overall length) where the ship's length is measured from the outer edge Linggi bow to stern Linggi the outer end or vice versa. d. The length of the ship that has been obtained is divided into n (10 to 20) sexy, then give the section number on the top stronghold stronghold as a sign to cross check records. At the bow and stern of the ship is divided into several sections it is necessary to increase the accuracy in reconstructing the boat line drawing plan. c. Then held a wide cross-section measurements were performed every section perpendicular horizontal width of the outside of the ship until it touches the arch shape of the hull and parallel vertical measurements move from the keel to the deck with a certain distance (10 cm. 15 cm or 20 cm) depending curvature of the shape of the hull were measured (Figure 19). d. Height and angle of the bow Linggi need didiukur specifically, this can be measured by measuring the height of Linggi direction is perpendicular to the base line and the distance between the intersections of these lines with cut points between. Or you can also use the arc tool to help determine the slope angle, but also have to measure the horizontal distance between the intersection of the hull with the bow of the projection Linggi endpoints Linggi bow towards the baseline. e. Likewise Linggi stern has a special form must be measure the size of the sketches made from many different directions as a guide when reconstructing the shape Linggi including positions stern rudder and propeller wake. f. And many more measurements on the body below the deck of a ship that is considered necessary. Figure 19. The measurement part of the hull below the deck. 1.2. Measurement to the top of the building. a. For the measurement of the building requires some measurement tools include: rollmeter that measures 50 and 5 meter and various other support equipment such as markers marker, wooden pencil, pen, flashlight, and a blank field survey base. b. Measurements in this section needs to hire two (2) people consisting of 1 (one) expert and 1 (one) supervision. c, As a first step is to measure the location of the position held building up above the weather deck, this work can be measured from the tip of the ship fore aft stronghold stronghold. d. Furthermore conduct measurements of length, width and height of the building, while at the time of measurement can be performed sketches on the overall architecture of the building as it also measures the doors the doors, window shutters, kitchen and sketches spatial size accommodation, the wheelhouse and another room that position located on the weather deck. e. Then the length, width and height of the hole and cover palkah need to be measured, besides that performed well measurements and sketches on some other equipment on deck include: wooden bollard, anchor winch, anchor, tank or freshwater drum, majestic pillars, poles maid, crane boom and fishing gear. f. And many more measurements at the top of the building above the deck of a ship that is considered necessary. 1.3. Sketching layout below the main deck, a. For sketching layout below deck this weather need some measuring tools, among others: rollmeter that measures 50 and 5 meter and various other support equipment such as pen, flashlight, and a blank field survey base. b. Sketching this section needs to hire two (2) people consisting of 1 (one) expert and 1 (one) supervision, that, where implementation can be done at the time held a piece of construction measurement and data inventory ship's main engines. c. As a first step is to set the measurement strategy conduct the sequencing of steps to implement a sketch of the niche is the bow, the cargo hold space, the engine room and the aft recess or vice versa because basically sketching layout below the weather deck is to locate the position of the room or the room above. 1.4. Measurement to the construction and logging machinery. a. For the measurement part of ship construction, machinery and propulsion is need some measuring tools, among others: rollmeter that measures 50 and 5 meter and various other support equipment such as markers marker, wooden pencil, pen, flashlight, and a blank field survey base. b. Measurements in this section requires a power of 3 (three) persons who consists of 2 (two) experts and 1 (one) supervision. c. As a first step is to set the measurement strategy held that the order of the division will be surveyed with the same ship that split into several sections: the niche bow section, the cargo hold space, the engine room and stern sections niche. While the administration of the measurement sequence can be initiated from the partially niche bow, the cargo hold, engine room and stern niche or otherwise. d. Measurements section of the hull construction throughout includes sizes: Linggi, hull, keel clamp, wrang, ivory, ivory range, galar kim, galar beams, deck, hull plank, board in, deck boards, insulation and other reinforcement, in addition to the also the construction section above the main deck includes stronghold stronghold and building upon. e. In the engine room also held recording the characteristics The main gear box including the main engine, generator set, propeller blades and rudder. Similarly, the volume and location of fuel tank tank. f. And many more measurements on the ship's construction, machinery and propulsion deemed necessary. 1.5. Inventory deck gear. a. For sketching deck gear requires some measure include: rollmeter and various other support equipment such as markers marker, wooden pencil, pen, blank fields and the base survey. b. Sketching this section requires enough force 1 ( one) expert. c. As a first step is to conduct the identification of the type of fishing gear used on the target object in the survey vessel. d. Observing the existing fishing equipment on deck and know how to operate technical mechanisms. e. Conducting interviews with boat owners, fishermen and the artisan fishing gear on the dimensions, asessoris and making sketches.

Related Posts :



Widget By : AcerNoval's Site

Related Post



0 comments:

Post a Comment

News Center © 2008. Design by :Yanku Templates Sponsored by: Tutorial87 Commentcute